2010
Iceland

Kárahnjúkar Hydroelectric Power Station is the heart of Iceland’s largest-ever industrial development. A € 1.1 billion hydroelectric power plant that took 5 years to build and required the construction of 73 km of tunnels and five dams for three reservoirs – one of the dams being amongst the largest concrete-faced rock-fill dams in the world. Sika supplied a wide range of concrete solutions for this project.

 

Project Requirements

The fill material of the 5 dams has a total volume of approx. 13’600’000 m³, which had to be prepared on site, then placed and compacted to achieve a watertight construction. The headrace tunnels were mostly excavated using a “full-face” tunnel boring system (TBM) with a diameter of 5.5 – 7.2 m; the others were built using the “drill and blast” method for cross sections of 5.8 × 5.8 m and 7.2 – 7.6 × 8 m.
 

Sika Solutions

A minimum 250 mm thick layer of shotcrete using Sigunit® accelerator was applied throughout the drives with additional rockbolts, steel ribs and even thicker layers of shotcrete applied in zones of more difficult geological conditions. For all of the concrete on the project Sika admixtures were used to ensure consistent performance and quality.

Under the prevailing harsh Icelandic environmental conditions the shotcrete admixtures Sigunit®-L53 AF (IS) and Sika® ViscoCrete®-SC 305 were also used to maintain the pumpability of the shotcrete. The sprayed concrete application equipment selected by the contractors included 8 Sika Putzmeister spraying systems, Sika PM®, plus 3 Aliva® shotcrete machines and pumps that were installed on the 3 Hardrock Robbins TBM’s. For the mass concrete on the dams the water reducing plasticiser Sika® Plastiment® LA-100 was used.
 

Products Used

  • Sigunit®-L53 AF (IS)
  • Sigunit®-P1 AF
  • Sika® ViscoCrete®-SC 305
  • Sika® Plastiment® LA-100
  • SikaFiber® 65/35
  • SikaPM®-400 – Sika-Putzmeister spraying systems
  • Aliva®-278 shotcrete pumps
  • Aliva®-403 accelerator dosing unit
  • Aliva®-285 rotor machines

Project Participants

Owner
Landsvirkjun, The National Power Company of Iceland

Design 
(excl. the Jökulsárveita diversion) Kárahnjúkar Engineering JV Káraborg, Kárahnjúkar Supervision JV

Contractors
Impregilo (Italy), Suðurverk (Iceland), Hochtief (Germany), Pihl & Sön (Denmark), Ístak (Iceland), Íslenskir aðalverktakar (Iceland), Va-Tech Escher Wyss (Germany and Austria), DSD Stahlbau (Germany)