Sikafloor® CureHard-24
Transparent surface hardener, dust proofer, sealing and curing compound for concrete
Sikafloor® CureHard-24 is a high solids, one part, clear sodium silicate based liquid to cure, harden and seal fresh or hardened concrete.
- Ready to use
- Easy to apply
- Improved chemical and abrasion resistance compared to untreated concrete
- Reduced dusting of concrete floors
- Slightly reduces loss of water of new concrete while setting
- Improves cleanability
- Non-yellowing
- Good penetration
- Solvent free
- Colourless and odourless
- Environmentally friendly
Usage
- Horizontal old or new concrete surfaces, where a hard surface with light to moderate abrasion resistance is required e.g. warehouses, industrial plants, stores, shopping malls, parking structures, service stations, hangars etc.
- On concrete slabs where no specific curing efficiency or standards are required
- Suitable for interior or exterior applications
- Suitable for protection against ingress (Principle 1, method 1.2 of EN 1504-9)
- Suitable for physical resistance (Principle 5, method 5.2 of EN 1504-9)
Advantages
- Ready to use
- Easy to apply
- Improved chemical and abrasion resistance compared to untreated concrete
- Reduced dusting of concrete floors
- Slightly reduces loss of water of new concrete while setting
- Improves cleanability
- Non-yellowing
- Good penetration
- Solvent free
- Colourless and odourless
- Environmentally friendly
Packaging
25 kg pail, 1000 kg IBC container
Colour
Clear liquid
Product Details
APPROVALS / CERTIFICATES
Impregnation for surface protection of concrete according to EN 1504-2:2004, ingress protection and physical resistance, Declaration of Performance 02 08 03 04 004 0 000001 1180, certified by notified factory production control certification body 1020, certificate of conformity of the factory production control 020025682, and provided with the CE marking.
JC/T 2158 China Industrial standard
Composition
Sodium silicate water dilution
Shelf life
12 months from date of production
Storage conditions
The product must be stored properly in original, unopened and undamaged sealed packaging, in dry conditions at temperatures between +5 °C and +30 °C. Protect from frost.
Density
~1.2 kg/l (at +20 °C)
Solid content by mass
~28 %
System structure
Curing compound: 1–2 coats
Hardener / Sealer: 1–2 coats
Abrasion resistance
50 mg or 81.5 % increase in abrasion resistance compared to untreated sample (C(0,70) concrete according to EN 1766) (Taber Abraser, H-22 Wheel, 1000 g / 1000 cycles) | (EN 5740-1) |
144% (≥140%) According to JC/T2158, Abrasion resistance ratio | (JC/T2158) |
Resistance to impact
60 Nm (class III: ≥ 20 Nm) | (EN 6272-1) |
Sample (MC(0,40) concrete according to EN 1766
Tensile adhesion strength
4.8 N/mm2 | (EN 1542) |
Sample (MC(0,70) concrete according to EN 1766
Penetration depth
5.5 mm | (EN 1504-2) |
Sample (MC(0,70) concrete according to EN 1766
Water absorption
w = 0.03 kg/m2×h0.5 (on a substrate w > 1 kg/m2 h0.5) | (EN 1062-3) |
4mm (≤5mm) Note: According to JC/T2158, Surface water absorption amount after 24h | (JC/T2158) |
93% (≥80%) Note: According to JC/T2158, Surface water absorption reduction rate after 24h | (JC/T2158) |
Application
Ambient air temperature
+5 °C min. / +35 °C max.
Relative air humidity
100 % max.
Substrate temperature
+5 °C min. / +35°C max.
Substrate moisture content
Can be applied on green concrete, without any bleed water.
Waiting time to overcoating
Where 2 coats are required, to ensure maximum densification, the second coat can be installed 2–4 hours following the first.
Allow previous coats to become tack free before applying additional coats.
Temperature | Time |
+5 °C | ~ 4 hours |
+10 °C | ~ 3.5 hours |
+20 °C | ~ 3 hours |
+25 °C | ~ 2 hours |
Times are approximate and will be affected by changing ambient conditions particularly temperature and relative humidity
Drying time
The surface is touch-dry after 2 hours at +20 °C.
Maximum sealing and hardening effect achieved after ~7 days at +20 °C.
Applied Product Ready for Use:
Substrate temperature | Fully serviceable |
+10°C | ~ 6 hours |
+20°C | ~ 5 hours |
+30°C | ~ 4 hours |
Note: Times are approximate and will be affected by changing ambient and substrate conditions.
Consumption
0.15–0.25 l/m2/coat (4–7 m2/l/coat).
This figure is theoretical and does not include for any additional material required due to surface porosity, surface profile, variations in level and wastage etc.
Yield
4–7 m2/l/coat
SUBSTRATE QUALITY
Fresh concrete
Surface must be free of bleed water and of sufficient strength to withstand finishing operations.
Hardened / old concrete
Surfaces must be sound, open textured, clean, free from frost, laitance, surface water, oils, grease, coatings, all loosely adhering particles and other surface contaminants.
If in doubt apply a test area first.
For best results with new concrete floors wait for 7–14 days after placement or until after cement has sufficiently hydrated prior to treatment with Sikafloor® CureHard-24.
SUBSTRATE PREPARATION
Fresh concrete
The concrete must be prepared by suitable power or manual floating / tamping techniques.
Hardened / old concrete
The substrate must be prepared by suitable cleaning method such as high pressure water cleaning or by ride-on cleaning machines. Allow drying prior to application. All dust, dirt, loose and friable material must be completely removed from all surfaces before application of the product, preferably by brush and / or vacuum.
APPLICATION
Fresh Concrete
Apply in a continuous film using a high volume low pressure spray unit as soon as the surface is firm enough to walk on and in sufficient quantity to keep the surface damp for at least 30 minutes.
After about 30 to 45 minutes, the material begins to gel and becomes slippery. Wet the material slightly with a water spray to reduce slipperiness and rework into the surface for 10 to 20 minutes with a soft bristle broom or floor-scrubbing machine. After about 20 minutes, the material will return to a gel. Rinse the floor and remove any excess material using a squeegee, wet vacuum or mop.
Hardened Concrete
Apply in a continuous film using a high volume low pressure spray unit.
To ensure maximum penetration, scrub material into the surface with a soft bristle broom or floor-scrubbing machine (min. 30 minutes), until the material begins to gel and becomes slippery. Wet the material slightly with a water spray and rework it into the surface for another 10 to 20 minutes. After this process, rinse the floor and remove any excess material using a squeegee, wet vacuum or mop.
On porous, rough-textured or broom-finished surfaces, a second coat may be required.
For large surfaces and higher placing rates, mechanical equipment such as ride-on cleaning machines can be also used to place, brush in and remove the excess material from the surface.
Thanks to proceeding chemical reaction the rate of water-tightness increases gradually, whereas maximum sealing and hardening effect occurs earliest after 7 days. Gloss of the surface gradually increases during 30 to 90 days depending upon cleaning frequency.
CLEANING OF EQUIPMENT
Clean all tools and application equipment with water immediately after use.
Hardened / cured material can only be mechanically removed.